CE Carbon Steel 90 Degree Elbow with Removable Up or Down Door

FOB Reference Price:Get Latest Price
200 Piece/Pieces 90 degree elbow carbon steel (Min. Order)
Report Suspicious Activity
Overview
Quick Details
Place of Origin:
Jiangsu, China (Mainland)
Brand Name:
Rainbow
size:
5"6"7"8"9"10"12"
color:
painted or powder coated
material:
carbon steel
Painted Temperature:
600 Celsius
SupplyAbility
SupplyAbility:
15000 Piece/Pieces per Month 90 degree elbow with inspection door
Packaging & Delivery
Port
Shanghai,Taicang
Product Description
Product Name
90 degree round elbow
Material
Carbon Steel
Color
Stainless steel colour, color painted or powder coated, can be customized
Standard
EN 1856-1, UL103
Certificate 
CE, UL103
Size
5-6 inch
Thickness
2.0mm, 3.0mm
Used
Wood fireplaces, pellet fireplaces, stove, boiler, generator, heater chimney

Advantages:
1.With a low cost, easy to replace.
2.Usually use in house, rapidly heat the whole room.

Products Show
Our Products

Double Wall Twist Lock System

Includes: Straight Pipe, adjustable pipe, adaptor, elbow, Tee, Wall support base, Tee cap, Terminal.

Double Wall Spigot Lock System

 Includes: Straight pipe, elbow, adaptor, Base wall support, Tee, Fire stop, Rain cap 

Carbon Steel Flue Pipe

Includes: Straight pipe, bend with inspection door, adaptor, Trim plate, round bend.

Australian Galvanized Flue Kits

Includes: Single wall decorative casing powder coated, Single wall decorative casing powder coated, Drop box powder coated, Single wall straight pipe, Rain cowl, Decorative plate powder coated, Fixed Bracket GAL.

Single Wall Flue Pipe

Single wall: SUS304, stainless steel color or color coating

Accessories

1st line from left to right: Anti down draught cowl, Rain cap, Flexi top cap, Base wall support.
2nd line from left to right: Firestop, Roof support, Adaptor, Reducer.
3rd line from left to right: Adjustable wall bracket, Wall bracket, Tee plug with drain, Roof support.
4th line from left to right: Triangle bracket, Storm collar, Locking band for twist lock, Locking band for spigot lock

Our Company

Factory

Our Factory

Workshop

Our Workshop

Warehouse

Our Warehouse

Team

Our Team

Our Machinery



Our Certifications

                        CE                           Passed Certificate Accords to UL103 Standard      Paten Certificate


Customer Photo

Our Show Room

FAQ

Q: Are you trading company or manufacturer ?

A: We are factory.

Q: How long is your delivery time?

A: Normally speaking, 1*20GP needs 14 days for delivery, 1*40GP needs 25 days for delivery.

Q: What is your terms of payment ?

A: T/T or LC. 
If you have another question, pls feel free to contact us as below: